Chengdu will add another southeast-northwest line to its metro network.

Line 13 Phase 1 stretches 29.07 km from Wayaotan Station in the west to Long’an Station in the east. It operates entirely underground, with a maximum speed of 100 km/h. The line includes 21 stations, including 11 stations that allow convenient transfers to 10 lines: Lines 1, 3, 5, 6, 7, 8, 9, and 17, as well as upcoming Lines 10 and 30. It passes through Qingyang District, Wuhou District, Jinjiang District, Longquanyi District, and other core areas.
In August this year, the Line 13 Phase 1 project commenced unmanned trial operations. As Chengdu’s first fully automated rail transit line using intracity Type A trains, it operates with 8A train formations. Each train stretches 186 meters in length, with a standard capacity of 2,164 passengers and a maximum capacity of 3,054. These trains are designed to be highly intelligent, comfortable, and safe.
Source: HomeinChengdu
The new measure for the online submission of the Foreigner Arrival Card by foreigners entering China was implemented starting from November 20, 2025
240—hour Visa-Free Transit Policy for Foreigners
Entry, Exit and Residence Procedures—Visas
Instructions on Accommodation Registration for Overseas Visitors
Application of Foreign Nationals for Extension of L (travel) Visa